DONATION PLEDGE: S$42,327.00 as at 14 Jan 2010, 12pm

DISTANCE COVERED: 150 km as at 2 Jan 2010, 9am

Tuesday, December 22, 2009

30 Hrs Running Route: Bedok Reservoir to MacRitchie Reservoir

The Run Challenge will start at 1 Jan 2010, 3.00am at the 0km mark of the Bedok Reservoir Park running trail as highlighted by the red balloon below. Kelly will run loops (each loop is 4.3km) around the Reservoir in anti-clockwise direction.


(Click on map for larger map) 



At approximately 1 Jan 2010, 5.00am, she will leave Bedok Reservoir and continue her run towards MacRitchie Reservoir Park (estimated distance is 13.2km) along the following roads:


  • 1. Bedok Reservoir Road  
  • 2. Kaki Bukit Ave 1
  • 3. Ubi Ave 2
  • 4. Circuit Road 
  • 5. Upper Adjunied Road
  • 6. Wan Tho Ave
  • 7. Potong Pasir Ave
  • 8. Kallang Park Connector 
  • 9. Braddell Road
  • 10. Thomson Road
  • 11. MacRitchie Reservoir
 
(Click on map for larger map)  



She is expected to reach MacRitchie Reservoir Park around 1 Jan 2010, 7.00am. Thereafter, she will continue the rest of her run by running as many loop as possible along the Yellow Trail Loop (each loop measuring approximately 10.5km) until 2 Jan 2010, 9.00am.


(Click on map for larger map) 



The Ending Point will be at the Zigzag Bridge of the MacRitchie Reservoir as indicated by the orange circle:




Note: The above distances mentioned are measured using google map. Actual distance will be measured and recorded using Garmin GPS during the run and we will update the respective distances mentioned via this blog and our Facebook Fanpage.